Jiantao Fan - Dr.
CTO
● 2005-2014 Beijing University of Chemical Technology Undergraduate, Master, Ph.D.
● 2014-2017 Postdoctoral fellow at Simon Fraser University, Canada
● Project Leader of National Key Research and Development Program of China
● Core members of Guangdong innovation and entrepreneurship team
● Core members of Shenzhen Peacock Team
● Shenzhen "Peacock Plan B" talents
Hui Li - Dr.
Chairman/CEO
● National "specially hired" experts
● The person in charge of the key hydrogen energy research and development projects of the national "14th Five-Year Plan"
● Chair Professor, Southern University of Science and Technology
● 1982-1989 Bachelor and Master of Chemical Engineering, Tsinghua University
● 2006 Ph.D. in Electrochemical Engineering, University of British Columbia, Canada
● 2007-2015 Senior Research Fellow of the National Research Institute of Canada
● In 2015, edited the first international monograph on PEM electrolyzed water
● More than 100 SCI papers, 4 monographs, 8 chapters, and more than 20 authorized patents
News
新闻资讯
2023-07-26 11:06:07
Click:
Xiangjing Gong, Deputy Director of Energy Department of Shenzhen Development and Reform Commission, Tiejun Feng, Party Group Member and Deputy Director of Shenzhen Longgang Development and Reform Bureau, attended the event and delivered speeches, Longgang District Industrial Service Group, Envision Energy, Renshihua Group, Sinopec Guangzhou Engineering Co., Ltd., SUSTech Asset Management Co., Ltd., HydraV, Schaeffler, CIMC Hydrogen, BYD, Hongzhou Gas, Contango, Hynovation, DongQi Energy, Scheme Capital, TrendBank, Shenzhen Hydrogen Energy and Fuel Cell Association and other related government leaders and guests from enterprises and associations attended the event.

Insist on technological innovation
Break through industrial bottlenecks
Proton exchange membrane, as the core material of PEM electrolysis hydrogen production, belongs to the "neck" link, the market in this field is mainly occupied by foreign brands, and is not specifically designed for electrolysis hydrogen production, due to the imbalance between supply and demand, the current procurement channels are few and costly.
Since the establishment of BriHynergy, the team insists on technological innovation, adheres to the positive development, and takes the core material of proton exchange membrane as the key material to ensure the technological barriers, seizes the high ground of electrolyzer technology, builds the industrial ecology, and provides one-stop solution for green hydrogen preparation. At present, BriHynergy has successfully researched and developed different types of proton exchange membranes, such as 80-100 micron, which have the advantages of low impedance, high selectivity, high mechanical stability and high chemical stability in corrosive environments, and have better performance and are more suitable for electrolysis of water for hydrogen production application.




4GW production line landing
Promote product cost reduction
After 8 months of production line design, equipment customization and manufacturing, construction and decoration, BriHynergy's the production line of Proton Exchange Membrane (PEM) was successfully put into production on July 12th. The production line uses precision slit coating technology, which has the advantages of high coating uniformity, fast coating speed, and a wide range of viscosity of applicable slurries, etc. The suspension heat treatment technology has the advantages of high heat evaporation efficiency and low operating tension, etc. The production line is capable of realizing the continuous production of 1,050 mm width, and the annual production capacity reaches 4GW, which is at the leading level in China.
This 4GW proton exchange production line is of great significance in China, marking the realization of localization, batch and scale production of the core material of PEM proton exchange membrane of BriHynergy, which also means that the cost of PEM proton exchange membrane has been reduced, and the optimization of the cost will promote the large-scale commercial application of PEM electrolytic water to hydrogen production.

3MW Order Delivery
Demonstrate the strength
On the scene, the first batch of 12 sets of 50 standard cubic meters 3MW PEM electrolyzer cooperated by BriHynergy and Envision Energy officially welcomed the delivery. This batch of electrolyzer has an input power of 250kW, a rated energy consumption of 4.55kWh/Nm3H2, an outlet pressure of 30barg, an operating efficiency of 77.7%HHV, and can operate stably over a wide power input range of 5%-150%, which is highly suitable for the fluctuating characteristics of wind power generation, and this batch of products will be used in the wind-generated green hydrogen integration demonstration project. This batch of products will be applied in the wind-generated green hydrogen integration demonstration project.
The delivery of 12 sets of 50 standard cubic meters of 3MW electrolyzer is not only the result of the accumulation of Hydrogen Glory's technology, but also a demonstration of the successful application of PEM's electrolysis of water for hydrogen production. In the future, we will continue to adhere to the innovation drive, constantly improve the technical level and product performance, help the development of hydrogen energy industry, and realize the dual-carbon goal as soon as possible.


Strategic Cooperation Signing
Realize win-win situation for all parties
In addition, on the scene, BriHynergy reached a strategic cooperation signing agreement with Envision Energy, Renshihua Group, Hongzhou New Energy, and East Hydrogen Energy.
According to the agreement, BriHynergy and Envision Energy will cooperate with each other in the field of wind power;BriHynergy,Renshihua Group and Hongzhou New Energy will cooperate with each other in the field of electronics, cutting and other gas applications; BriHynergy and East Hydrogen Energy will cooperate with each other in the field of hydrogen energy storage demonstration projects.
All parties indicated that they will strengthen hydrogen energy technology innovation and market expansion by integrating their respective resources and advantages, and jointly explore new opportunities and breakthroughs in the field of hydrogen energy, so as to promote the development of green energy industry and build a clean and low-carbon future.



The commissioning of the 4GW proton exchange membrane production line and the delivery of 12 sets of 50 standard cubic meters of 3MW electrolyzer are major milestones in the development history of Hydrogen Flare, marking that Hydrogen Flare's products have the capability of rapid delivery of localized and scaled products; at the same time, it will also have a positive impact on the hydrogen energy industry, and is of great significance to the promotion of the large-scale application of PEM electrolysis of water to produce hydrogen.
0755-84530503
Monday to Friday
zhaodeshu@brihynergy.com